1075KWh Peak-Shaving and Valley-Filling Solar Project in Guatemala

The peak-shaving and valley-filling energy storage project utilizes energy storage devices to reduce energy costs for businesses by timely adjusting reported demand and peak-valley electricity price differentials. This alleviates peak power demand, improves the utilization rate of existing grid equipment and grid operating efficiency, and effectively reduces grid load pressure.